Baglan Power Station

Our Designers were commissioned by the GE, Welsh Government and Port Talbot Council to design the exterior of this Combined Cycle Gas Turbine 400MW power station. Working closely with the wider consultancy team, one of the most advanced CCGT facilities was developed and is still operational today.

At the time of consent, this power station was considered the most advanced CCGT facility of its kind.